Latest Pictures from FOD
- Rolling compactor
- The first culverts in place
- The road grader in the background
- The Entry road to Field of Dreams. You can see where the gate will be
- Regrading of the middle long term pad, and with a new drainage ditch
- This is one of the first days that all the crew was there, about 40 in all
- Temporary housing is just about done
- Inside the crew quarters
- This is the temporary water storage pit.
- The temporary Water pit is done
- The retaining wall excavation is almost done.
- The wall being finished
- The wall being finished
- The wall being finished
- Wall being built
- The first section of security wall to be coated with plaster
- Upper Right corner at the top of the property
- Midday on the building/security wall.
- Midday on the building/security wall
- Midday on the building/security wall
- watch this mason laying bricks one at a time, using a string plumb bob to get each one perfect
- The walls are really starting to take shape
- The walls are coming together
- Northwest Security Wall
- No hat, no problem. Just make one from a cement bag.
- The Well Drilling rig is here and heading down our road
- starting to set up the equipment
- After getting stuck in the mud for 30 minutes, the drill rig is set and ready to start drilling
- They are ready to go
- We hit water at 200 feet
- Hit water at 200 feet
- The local kids sat there for hours, watching the BIG SHOW!
- The last casing to be removed from the well. The well produced 66 gallons a minute!